Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Afshar, A, Ziaraty, A K, Kaveh, A and Sharifi, F (2009) Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization. Journal of Construction Engineering and Management, 135(07), 668–74.

Cha, H S, Kim, J and Han, J (2009) Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. Journal of Construction Engineering and Management, 135(07), 647–56.

Cheng, G and Wilmot, C G (2009) Louisiana Highway Construction Cost Trend after Hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(07), 594–600.

Hale, D R, Shrestha, P P, Gibson, G E and Migliaccio, G C (2009) Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Journal of Construction Engineering and Management, 135(07), 579–87.

Kanit, R, Gunduz, M and Ozkan, O (2009) Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects. Journal of Construction Engineering and Management, 135(07), 609–13.

Lin, P, Lee, W and Lee, M (2009) Exploring Problems and Undesired Effects in the Construction Development Process: The Case of a Small- to Medium-Sized Developer in Taiwan. Journal of Construction Engineering and Management, 135(07), 560–9.

Ling, F Y and Gui, Y (2009) Strengths, Weaknesses, Opportunities, and Threats: Case Study of Consulting Firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(07), 628–36.

Miller, L, Mannering, F and Abraham, D M (2009) Effectiveness of Speed Control Measures on Nighttime Construction and Maintenance Projects. Journal of Construction Engineering and Management, 135(07), 614–9.

Perkins, R A (2009) Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, 135(07), 588–93.

Wan, S K, Kumaraswamy, M M and Liu, D T (2009) Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects. Journal of Construction Engineering and Management, 135(07), 637–46.

Watkins, M, Mukherjee, A, Onder, N and Mattila, K (2009) Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(07), 657–67.

Yang, J and Yin, P (2009) Isolated Collapsed But-For Delay Analysis Methodology. Journal of Construction Engineering and Management, 135(07), 570–8.

Zhu, Y, Ahmad, I and Wang, L (2009) Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects. Journal of Construction Engineering and Management, 135(07), 601–8.

Zou, P X and Zhang, G (2009) Comparative Study on the Perception of Construction Safety Risks in China and Australia. Journal of Construction Engineering and Management, 135(07), 620–7.